Last Wednesday (3/20/2013) Stacey and I had the redline meeting at Saddletree's design center. The redline meeting was to make sure everyone (Us, Saddletree Sales, Architect, Designer, and Superintendent) are all on the same page and sign off on the design. This means Saddletree is ready to start the house build. We were told the foundation dig would start sometime next week.
Well it started that Friday 3/22/2013!!!
Stacey and I are going take pictures everyday so we can put them all together into a cool house construction movie.
Foundation markings. Monday 3/25/1203
Base foundation poured. Thur. 3/28/2013
Garage foundation
Still need to pour the vertical portion of the foundation.
Our house looks like it is being wedged in there pretty tight. Cordera has a minimum 5' offsets to the property line so min. 10' between houses. Looks like we will be inside those minimums.
This neighbor is just getting their landscaping put in. The landscapers were storing some of their materials on our lot. Saddletree basically told the landscapers they had to move or lose it. Not the safest place to walk around. It's an 8' fall onto rebar.
Next post is Flooring and Tiles... Check back soon.