Plumbing, Electrical and Low Voltage

2 June 2013 

I know it has been a while since the last blog. We've been very busy with moving out of our rental and in to the basement of our friends Russ and Ali. Stacey and I realized that we've moved every other Memorial weekend for the last 5 years.
Here is the latest view of the front of the house. We got our fancy garage doors with some sweet windows and gutters are installed.

Stacey looks like a little girl in front of the 8' front door.

Door from the master suite onto the deck.

Master bed ceiling

Water-closet light and vent.



8' sliding glass door onto the deck.

Added 2 canned lights into the covered deck.

Kitchen lighting- 3 hanging pendent and 5 canned lights

Basement view after plumbing and electrical. The red and blue Pex on the right is for our future wet bar.

Basement view of the stairs and mech room.


Oops, looks like electrical guys sheared a vent pipe.

Busy utility run down the center of the basement.


Audio/Video pull tubes

Master control

Entrance lighting

Breaker panel

Added second canned light to master shower

Added 4 canned lights to great room

Coach lighting location entrance


Garage wash tub hookup

Water source


Furnace and 50 gal hot water heater
Furnace inner air source, there is another that pulls air from outside

Natural gas lines for deck BBQ.

Natural gas line for patio (More BBQ)

Added outlet for freezer in mech room


Welcome to the Jungle!!!


More pull tubes TV in Great Room

Power meter location


Tub hot/cold water valve
Dual hot/cold water valves for master shower. Left side is for rain shower head.


Laundry room hookups

Last picture...that is a lot of windows!!!


No comments:

Post a Comment